东京热日本天堂婷婷,国产又爽又黄又不遮挡视频,每天av专区无码,男人J桶女人P免费视频,无码精品国产一区二区三区免费,不卡午夜福利成人电影院

東莞市星火太陽能科技股份有限公司

13215150267
星火太陽能和你一起了解更多太陽能資訊
2022,16地分布式光伏仍享受補(bǔ)貼!
返回列表 來源: 發(fā)布日期: 2022.05.30 瀏覽次數(shù):

2022年國家不再下發(fā)光伏補(bǔ)貼,但還有16地享受市級、區(qū)級補(bǔ)貼!
1、深圳
1月21日,廣東省深圳市發(fā)改委印發(fā)《深圳市分布式光伏發(fā)電項(xiàng)目管理操作指引(征求意見稿)》,提出:市級財(cái)政對納入補(bǔ)貼范圍的發(fā)電量予以補(bǔ)貼,其中:

基準(zhǔn)常規(guī)光伏項(xiàng)目:2022年、2023年并網(wǎng)發(fā)電的項(xiàng)目補(bǔ)貼標(biāo)準(zhǔn)為0.3元/千瓦時(shí),2024年、2025年并網(wǎng)發(fā)電的項(xiàng)目補(bǔ)貼標(biāo)準(zhǔn)為0.2元/千瓦時(shí),2026年并網(wǎng)發(fā)電的項(xiàng)目補(bǔ)貼標(biāo)準(zhǔn)為0.1元/千瓦時(shí);

光伏建筑一體化(BIPV)項(xiàng)目:補(bǔ)貼標(biāo)準(zhǔn)為基準(zhǔn)常規(guī)光伏項(xiàng)目的1.2倍。
2、北京市順義區(qū):



2021年5月18日,北京市順義區(qū)發(fā)改委下發(fā)《關(guān)于印發(fā)進(jìn)一步支持光伏發(fā)電系統(tǒng)推廣應(yīng)用的通知》,在北京市的補(bǔ)貼上,區(qū)級按照市級補(bǔ)貼標(biāo)準(zhǔn) 1:1 比例進(jìn)行補(bǔ)貼,補(bǔ)貼期限為 5 年。
2020 年 1 月 1 日 至 2021 年 12 月 31 日期間采用“自發(fā)自用為主,余量上網(wǎng)”模式 并網(wǎng)發(fā)電的分布式光伏發(fā)電項(xiàng)目,區(qū)級財(cái)政按項(xiàng)目實(shí)際發(fā)電量給予補(bǔ)貼,每個(gè)項(xiàng)目的補(bǔ)貼期限為 5 年,補(bǔ)貼對象為法人單位或個(gè) 人。
1.常規(guī)類項(xiàng)目補(bǔ)貼標(biāo)準(zhǔn)。適用一般工商業(yè)電價(jià)、大工業(yè)電價(jià)或農(nóng)業(yè)生產(chǎn)電價(jià)的項(xiàng)目補(bǔ) 貼標(biāo)準(zhǔn)為每千瓦時(shí) 0.3 元(含稅)。個(gè)人利用自有產(chǎn)權(quán)宅基地建設(shè) 的戶用光伏發(fā)電項(xiàng)目補(bǔ)貼標(biāo)準(zhǔn)為每千瓦時(shí) 0.3 元(含稅)。 
2.提高部分領(lǐng)域補(bǔ)貼標(biāo)準(zhǔn)。 學(xué)校、社會(huì)福利場所等執(zhí)行居民電價(jià)的非居民用戶項(xiàng)目補(bǔ)貼 標(biāo)準(zhǔn)為每千瓦時(shí) 0.4 元(含稅)。 
3.支持高端應(yīng)用。 全部實(shí)現(xiàn)光伏建筑一體化應(yīng)用(光伏組件作為建筑構(gòu)件)的 項(xiàng)目,補(bǔ)貼標(biāo)準(zhǔn)為每千瓦時(shí) 0.4 元(含稅)。
3、北京市西城區(qū):
2021年1月15日,北京市西城區(qū)發(fā)改委下發(fā)《北京市西城區(qū)支持鼓勵(lì)節(jié)能降耗管理辦法》(修訂)的通知,提出:
節(jié)能資金支持方式分為補(bǔ)助和直接獎(jiǎng)勵(lì)。項(xiàng)目申報(bào)單位可根據(jù)項(xiàng)目具體情況自愿申報(bào)資金支持方式,同一項(xiàng)目只能申請一種方式。補(bǔ)貼有效期至2025年12月31日。
新能源、可再生能源開發(fā)利用及推廣項(xiàng)目,給予總投資額30%的補(bǔ)助;
合同能源管理項(xiàng)目,在北京市政府補(bǔ)助基礎(chǔ)上給予市級補(bǔ)助資金50%的補(bǔ)助;
通過國家綠色建筑運(yùn)行三星、二星認(rèn)證標(biāo)識的建筑,在享受國家、市級獎(jiǎng)勵(lì)的同時(shí),分別一次性給予30萬元、20萬元的獎(jiǎng)勵(lì)。
4、北京市經(jīng)開區(qū):
2021年8月23日,北京經(jīng)濟(jì)技術(shù)開發(fā)區(qū)管理委員會(huì)下發(fā)文件《北京經(jīng)濟(jì)技術(shù)開發(fā)區(qū)2021年度綠色發(fā)展資金支持政策(征求意見稿)》,擬對15類綠色低碳項(xiàng)目給予政策性資金支持。其中,分布式光伏項(xiàng)目擬在北京市級資金補(bǔ)助的基礎(chǔ)上,經(jīng)開區(qū)按照1:1配套獎(jiǎng)勵(lì)。補(bǔ)貼期限為 1年。
5、北京通州區(qū):
2021年11月10日,北京市通州區(qū)人民政府發(fā)布《通州區(qū)綠色化改造提升項(xiàng)目補(bǔ)助資金管理辦法(試行)》。
綠色化補(bǔ)助資金重點(diǎn)支持范圍:圖片

6、 浙江省樂清市(市級補(bǔ)貼)
2021年4月21日,浙江省樂清市人民政府發(fā)布《關(guān)于調(diào)整全市居民分布式光伏發(fā)電項(xiàng)目市級財(cái)政補(bǔ)貼的通知》,提出:

對于2021年4月30日之前并網(wǎng)以及2020年8月1日之前并網(wǎng)的分布式光伏項(xiàng)目則繼續(xù)享受之前0.3元的補(bǔ)貼;5月1日之后并網(wǎng)的分布式光伏發(fā)電項(xiàng)目補(bǔ)貼調(diào)整至0.2元/度;2022年1月1日之后并網(wǎng)的分布式光伏發(fā)電項(xiàng)目補(bǔ)貼調(diào)整至0.1元/度。

對2021年5月1日之后并網(wǎng)的居民分布式光伏發(fā)電項(xiàng)目,符合相關(guān)規(guī)定要求的,樂清市級財(cái)政補(bǔ)貼調(diào)整至每千瓦時(shí)0.2元,有效期至2021年12月31日止。
對2022年1月1日之后并網(wǎng)的居民分布式光伏發(fā)電項(xiàng)目,符合相關(guān)規(guī)定要求的,樂清市級財(cái)政補(bǔ)貼調(diào)整至每千瓦時(shí)0.1元,有效期至2022年12月31日止。
2023年1月1日起取消樂清市級財(cái)政補(bǔ)貼。
7、浙江省寧波市
2021年9月,寧波市住房和城鄉(xiāng)建設(shè)局印發(fā)《關(guān)于大力推進(jìn)建筑屋頂分布式 光伏發(fā)電系統(tǒng)應(yīng)用工作的若干意見》 (征求意見稿),提出:
由市級財(cái)政對2021年至2025年期間并網(wǎng)的建筑屋頂光伏項(xiàng)目按0.3元/千瓦時(shí)標(biāo)準(zhǔn)給予補(bǔ)貼,補(bǔ)貼時(shí)限為并網(wǎng)發(fā)電之后第二個(gè)完整抄表月起12個(gè)月。
8、浙江省云和縣
2021年11月30日,云和縣發(fā)改委發(fā)布《關(guān)于戶用光伏發(fā)電項(xiàng)目補(bǔ)助有關(guān)事項(xiàng)的通知》,2021年,省能源局下達(dá)云和縣可再生能源專項(xiàng)資金80萬元,經(jīng)研究,決定將該筆資金用于支持戶用光伏發(fā)電項(xiàng)目的發(fā)展。
1.2021年并網(wǎng)的戶用光伏發(fā)電項(xiàng)目給予1元/瓦的補(bǔ)助,2022年并網(wǎng)的戶用光伏發(fā)電項(xiàng)目給予0.8元/瓦的補(bǔ)助,2023年并網(wǎng)的戶用光伏發(fā)電項(xiàng)目給予0.6元/瓦的補(bǔ)助。每戶最高補(bǔ)助不超過5000元。

2.補(bǔ)助資金按電力公司出具的并網(wǎng)時(shí)間先后順序給予安排,按照誰投資誰受益的原則進(jìn)行補(bǔ)助,直至80萬元資金分配完畢。

9、浙江省平湖市
2021年10月26日,浙江省嘉興市平湖市發(fā)展和改革局印發(fā)關(guān)于公開征求《平湖市新一輪鼓勵(lì)光伏發(fā)電項(xiàng)目建設(shè)的若干意見(征求意見稿)》意見的公告,提出:
(一)對工商業(yè)屋頂光伏發(fā)電項(xiàng)目,實(shí)行三年發(fā)電量補(bǔ)助,每年按實(shí)際發(fā)電量給予0.1元/千瓦時(shí)電價(jià)補(bǔ)助。
(二)對學(xué)校、醫(yī)院、黨政機(jī)關(guān)和村(社區(qū))等公共建筑屋頂光伏發(fā)電項(xiàng)目,實(shí)行三年發(fā)電量補(bǔ)助,每年按實(shí)際發(fā)電量給予0.15元/千瓦時(shí)電價(jià)補(bǔ)助。
(三)對“農(nóng)光互補(bǔ)”光伏發(fā)電項(xiàng)目,實(shí)行三年發(fā)電量補(bǔ)助,每年按實(shí)際發(fā)電量給予0.2元/千瓦時(shí)電價(jià)補(bǔ)助。
(四)對居民戶用屋頂光伏發(fā)電項(xiàng)目實(shí)行一次性裝機(jī)補(bǔ)助,按裝機(jī)容量1元/瓦補(bǔ)助。
10、浙江省柯橋區(qū)
12月16日,紹興市柯橋區(qū)發(fā)改委公布的《關(guān)于柯橋區(qū)整區(qū)屋頂分布式光伏開發(fā)試點(diǎn)實(shí)施方案的公示》中,

2021年1月1日--2025年12月31日期間:在柯橋區(qū)內(nèi)投資建設(shè)符合分布式光伏3.0要求,并通過區(qū)發(fā)改局驗(yàn)收,接入柯橋區(qū)光伏數(shù)字化智慧管理平臺的非戶用光伏項(xiàng)目,自驗(yàn)收通過之日起,根據(jù)實(shí)際發(fā)電量按每千瓦時(shí)0.25元對項(xiàng)目業(yè)主進(jìn)行補(bǔ)助,補(bǔ)助周期為5年,在安裝首年一年兌現(xiàn)一次,此后每半年兌現(xiàn)一次。

11、廣東省廣州市黃浦區(qū)/開發(fā)區(qū)/高新區(qū):
2021年5月12日,廣州市黃埔區(qū)、開發(fā)區(qū)、高新區(qū)發(fā)改局聯(lián)合下發(fā)《廣州市黃埔區(qū) 廣州開發(fā)區(qū) 廣州高新區(qū)促進(jìn)綠色低碳發(fā)展辦法》
對分布式光伏發(fā)電的投資方按照發(fā)電量給予補(bǔ)貼,

應(yīng)用方(屋頂方)為非公共機(jī)構(gòu)的:補(bǔ)貼標(biāo)準(zhǔn)為0.15元/千瓦時(shí)、

應(yīng)用方(屋頂方)為公共機(jī)構(gòu)的:補(bǔ)貼標(biāo)準(zhǔn)為0.3元/千瓦時(shí)。

以2020年計(jì)起,單個(gè)項(xiàng)目最高享受補(bǔ)貼時(shí)間為6年。補(bǔ)貼時(shí)間范圍為2020-2025年。

對采用合同能源管理模式建設(shè)分布式光伏發(fā)電項(xiàng)目應(yīng)用方(屋頂方)按照項(xiàng)目裝機(jī)容量給予一次性獎(jiǎng)勵(lì),獎(jiǎng)勵(lì)標(biāo)準(zhǔn)為0.2元/瓦。單個(gè)項(xiàng)目最高獎(jiǎng)勵(lì)金額為200萬元。

12、廣東省東莞市(市級補(bǔ)貼)
屬于太陽能光電建設(shè)工程一體化或分布式光伏的項(xiàng)目且裝機(jī)容量不小于20KWp,補(bǔ)貼金額為2元/Wp;
屬于太陽能光電建設(shè)工程一體化或分布式光伏的項(xiàng)目且裝機(jī)容量不小于20KWp,補(bǔ)貼金額為2元/Wp;
2017~2018年底取得市發(fā)改局備案且經(jīng)市供電部門并網(wǎng)驗(yàn)收的分布式光伏發(fā)電項(xiàng)目,裝機(jī)容量在120MW以內(nèi)。享受補(bǔ)貼的有效期延至2024年12月31日
辦法明確,專項(xiàng)資金的補(bǔ)助方式為事后補(bǔ)助,補(bǔ)助標(biāo)準(zhǔn)如下:
對建設(shè)分布式光伏發(fā)電項(xiàng)目的各類型建筑和構(gòu)筑物業(yè)主,按裝機(jī)容量18萬元/兆瓦進(jìn)行裝機(jī)補(bǔ)助,單個(gè)項(xiàng)目補(bǔ)助最高不超過144萬元,補(bǔ)助平均分四個(gè)財(cái)政年度撥付。
對機(jī)關(guān)事業(yè)單位、工廠、交通站場、商業(yè)、學(xué)校、醫(yī)院、社區(qū)、農(nóng)業(yè)大棚等非自有住宅建設(shè)企業(yè)分布式光伏發(fā)電項(xiàng)目的各類投資者,按實(shí)際發(fā)電量補(bǔ)助0.1元/千瓦時(shí),補(bǔ)助時(shí)間自補(bǔ)助申請批準(zhǔn)后的次月起,連續(xù)5年進(jìn)行補(bǔ)助。
對利用自有住宅及在自有住宅區(qū)域內(nèi)建設(shè)的居民分布式光伏發(fā)電項(xiàng)目的自然人投資者,按實(shí)際發(fā)電量補(bǔ)助0.3元/千瓦時(shí),補(bǔ)助時(shí)間自補(bǔ)助申請批準(zhǔn)后的次月起,連續(xù)5年進(jìn)行補(bǔ)助。
13 、江蘇省南京市(市級補(bǔ)貼)
2021年3月16日,南京市城鄉(xiāng)建設(shè)委員會(huì)與南京市財(cái)政局聯(lián)合印發(fā)關(guān)于印發(fā)《南京市綠色建筑示范項(xiàng)目管理辦法》的通知,就進(jìn)一步推動(dòng)南京市綠色建筑高質(zhì)量發(fā)展出臺相關(guān)政策。
綠色建筑示范項(xiàng)目給予一次性資金補(bǔ)助,同時(shí)不高于合同價(jià)的50%。綠色建筑單體示范項(xiàng)目按照建筑面積予以補(bǔ)助,二星級示范項(xiàng)目補(bǔ)助標(biāo)準(zhǔn)為20元/m2,最高不超過30萬元;三星級示范項(xiàng)目補(bǔ)助標(biāo)準(zhǔn)為30元/m2,最高不超過50萬元;綠色建筑片區(qū)集成示范及綠色小鎮(zhèn)項(xiàng)目根據(jù)規(guī)模和技術(shù)應(yīng)用水平由專家評審決定,補(bǔ)助金額最高不超過300萬元。
新建淺層地能(地源熱泵、水源熱泵、可再生能源區(qū)域能源站)示范項(xiàng)目按照示范面積不超過50元/m2予以補(bǔ)助;太陽能光伏項(xiàng)目按照不超過500元/kW予以補(bǔ)助。原則上單個(gè)可再生能源建筑應(yīng)用示范項(xiàng)目補(bǔ)助金額最高不超過200萬元。年進(jìn)行補(bǔ)助。
14、江蘇省蘇州工業(yè)園區(qū)(區(qū)級補(bǔ)貼)
在蘇州工業(yè)園區(qū)內(nèi),對于備案實(shí)施且已并網(wǎng)投運(yùn),接入園區(qū)低碳能源公共服務(wù)平臺的項(xiàng)目,補(bǔ)貼3年:
分布式光伏按自投運(yùn)后的發(fā)電量進(jìn)行補(bǔ)貼0.1元/千瓦時(shí)。
儲(chǔ)能項(xiàng)目按自投運(yùn)后的發(fā)電量(放電量)進(jìn)行補(bǔ)貼0.3元/千瓦時(shí)。
該補(bǔ)貼有效期至2021年12月31日。

15、江蘇省蘇州吳江區(qū)
2021年11月19日,蘇州市吳江區(qū)人民政府發(fā)布《關(guān)于印發(fā)吳江區(qū)分布式光伏規(guī)模化開發(fā)實(shí)施方案的通知》。通知提出:力爭到2023年底,全區(qū)新增光伏裝機(jī)500兆瓦左右,到2025年底,再新增光伏裝機(jī)500兆瓦左右。


實(shí)施財(cái)政補(bǔ)貼。每年安排一定財(cái)政資金,對2021年7月至2023年底期間并網(wǎng)發(fā)電,且接入全區(qū)光伏發(fā)電數(shù)字化管理平臺的光伏和儲(chǔ)能項(xiàng)目進(jìn)行補(bǔ)貼:

工業(yè)企業(yè)分布式光伏項(xiàng)目應(yīng)用方(屋頂方)補(bǔ)貼0.1元/千瓦時(shí),補(bǔ)貼項(xiàng)目1年的發(fā)電量;
居民屋頂光伏項(xiàng)目按1元/瓦對投資方進(jìn)行一次性裝機(jī)補(bǔ)助;
學(xué)校、醫(yī)院、黨政機(jī)關(guān)和村(社區(qū))等公共建筑屋頂光伏及其他項(xiàng)目補(bǔ)貼投資方0.2元/千瓦時(shí),補(bǔ)貼2年發(fā)電量;
對實(shí)際投運(yùn)的儲(chǔ)能項(xiàng)目,按照實(shí)際放電量給予運(yùn)營主體補(bǔ)貼0.9元/千瓦時(shí),補(bǔ)貼2年放電量。
16、陜西省西安市:
2020年12月25日,西安市工信局發(fā)布《關(guān)于向社會(huì)公開征求《關(guān)于進(jìn)一步促進(jìn)光伏產(chǎn)業(yè)持續(xù)健康發(fā)展的意見(征求意見稿)》修改意見的通告》,提出:
1)對新進(jìn)入工信部《光伏制造行業(yè)規(guī)范條件》公告的企業(yè),一次性獎(jiǎng)勵(lì)50萬元。
2)對2021年1月1日至2023年12月31日期間建成并網(wǎng)且符合國家和行業(yè)標(biāo)準(zhǔn)的分布式光伏項(xiàng)目,自并網(wǎng)次月起給予投資人0.1元/千瓦時(shí)補(bǔ)貼,連續(xù)補(bǔ)貼5年
3)對2021年1月1日至2023年12月31日期間建成運(yùn)行的光伏儲(chǔ)能系統(tǒng),自項(xiàng)目投運(yùn)次月起對儲(chǔ)能系統(tǒng)按實(shí)際充電量給予投資人1元/千瓦時(shí)補(bǔ)貼,同一項(xiàng)目年度補(bǔ)貼最高不超過50萬元。

In 2022, the country will no longer issue photovoltaic subsidies, but there are 16 places to enjoy municipal and district-level subsidies!  

1, shenzhen  

On January 21, The Development and Reform Commission of Shenzhen, Guangdong province issued the Operation Guidelines for The Management of Distributed Photovoltaic Power Generation Projects in Shenzhen (Draft for Comments), and proposed that the municipal finance should subsidize the power generation included in the scope of subsidies, among which:  

 

Standard conventional photovoltaic projects: in 2022 and 2023 grid-connected power generation project subsidy standard is 0.3 yuan/KWH, in 2024 and 2025 grid-connected power generation project subsidy standard is 0.2 yuan/KWH, 2026 grid-connected power generation project subsidy standard is 0.1 yuan/KWH;  

 

Photovoltaic building Integration (BIPV) project: the subsidy standard is 1.2 times that of the base conventional PV project.  

2. Shunyi District, Beijing  

On May 18, 2021, Beijing Shunyi District Development and Reform Commission issued the Notice on Printing and Distributing Further Support for the Promotion and Application of PHOTOVOLTAIC Power Generation System. In terms of subsidies in Beijing, the district level will be subsidized in a 1:1 ratio according to the municipal subsidy standard, and the subsidy period will be 5 years.  

From January 1, 2020 to December 31, 2021, the distributed photovoltaic power generation projects that adopt the mode of "self-use mainly, surplus access to the Internet" will be subsidized by the district-level finance according to the actual generating capacity of the projects. The subsidy period of each project is 5 years, and the subsidy object is the legal entity or individual.  

1. Standard of subsidy for routine projects.  The subsidy standard for general industrial and commercial electricity price, large industrial electricity price or agricultural production electricity price is 0.3 yuan per kilowatt hour (including tax).  The subsidy standard for household photovoltaic power generation projects built by individuals using homestead with their own property rights is 0.3 yuan per KWH (including tax).  

2. We will raise subsidies in some sectors.  The subsidy standard for non-resident users of schools and social welfare facilities that implement the residential electricity price is 0.4 yuan per kilowatt hour (including tax).  

3. Support high-end applications.  The subsidy standard for all projects that realize integrated application of photovoltaic buildings (photovoltaic modules as building components) is 0.4 yuan per KWH (tax included).  

3. Xicheng District, Beijing  

On January 15, 2021, The Xicheng District Development and Reform Commission of Beijing issued the Notice of "Management Measures for Supporting and Encouraging Energy Saving and Consumption Reduction in Beijing Xicheng District" (Amendment), proposing:  

Energy saving funds are supported by subsidies and direct rewards.  Project applicants can voluntarily declare the method of financial support according to the specific situation of the project, and only one method can be applied for the same project.  The subsidy is valid until December 31, 2025.  

30% of the total investment will be subsidized for new and renewable energy development, utilization and promotion projects;  

For energy management contract projects, 50% of the municipal subsidy will be given based on the subsidy from Beijing Municipal government;  

Buildings that pass the national green building certification of three stars and two stars will be awarded 300,000 yuan and 200,000 yuan respectively while enjoying the national and municipal awards.  

4. Beijing Economic development Zone:  

On August 23, 2021, the Management Committee of Beijing Economic and Technological Development Zone (BEDDA) issued the Policy on 2021 Fund Support for Green Development in Beijing Economic and Technological Development Zone (Draft), which plans to provide policy fund support for 15 types of green and low-carbon projects.  Among them, the distributed photovoltaic project will be based on the capital subsidy of Beijing city, and will be rewarded in accordance with 1:1 matching by the development zone.  The subsidy lasts for one year.  

5. Tongzhou District, Beijing  

On November 10, 2021, the People's Government of Tongzhou District of Beijing issued the "Tongzhou District Green Renovation and Upgrading Project Subsidy Fund Management Measures (Trial)".  

Green subsidy funds focus on the scope of support: pictures  

 

6. Yueqing City, Zhejiang Province (municipal subsidies)  

On April 21, 2021, the People's Government of Yueqing City, Zhejiang Province issued a Notice on the Adjustment of municipal financial Subsidies for Residential Distributed Photovoltaic Power Generation Projects, stating that:  

 

For distributed photovoltaic projects connected to the grid before April 30, 2021 and before August 1, 2020, they will continue to enjoy the previous subsidy of 0.3 yuan;  Subsidies for distributed photovoltaic power generation projects connected to the grid after May 1 will be adjusted to 0.2 yuan/KWH;  Subsidies for distributed photovoltaic power generation projects connected to the grid after January 1, 2022 will be adjusted to 0.1 yuan/KWH.  

 

For residential distributed photovoltaic power generation projects that are connected to the grid after May 1, 2021, if they meet the requirements of relevant regulations, the fiscal subsidy of Yueqing will be adjusted to 0.2 yuan per KWH, and the subsidy will be valid until December 31, 2021.  

For residential distributed photovoltaic power generation projects that are connected to the grid after January 1, 2022 and meet the requirements of relevant regulations, the fiscal subsidy of Yueqing city will be adjusted to 0.1 yuan per KWH, and the period of validity will end on December 31, 2022.  

Yueqing municipal financial subsidies will be cancelled from January 1, 2023.  

7. Ningbo, Zhejiang Province  

In September 2021, Ningbo Municipal Bureau of Housing and Urban-Rural Development issued Several Opinions on Vigorously Promoting the Application of Distributed Photovoltaic Power Generation System on Building Roofs (draft for Comments), proposing:  

The municipal finance will provide subsidies of 0.3 yuan/KWH for rooftop pv projects connected to the grid from 2021 to 2025, and the subsidy duration is 12 months from the second complete meter reading month after the grid power generation. 

Yunhe County, Zhejiang Province  

On November 30, 2021, Yunhe County Development and Reform Commission issued a notice on household PHOTOVOLTAIC power generation project subsidies. In 2021, the provincial Energy Bureau issued a special fund of 800,000 yuan for renewable energy in Yunhe County. After study, it was decided to use the fund to support the development of household photovoltaic power generation projects.  

1. Subsidies of 1 YUAN/w will be given to household PHOTOVOLTAIC power generation projects connected to the grid in 2021, 0.8 yuan/w will be given to household PHOTOVOLTAIC power generation projects connected to the grid in 2022, and 0.6 yuan/w will be given to household photovoltaic power generation projects connected to the grid in 2023.  The maximum subsidy for each household shall not exceed 5,000 yuan.  

 

2. The subsidy funds shall be arranged according to the time sequence of grid connection issued by the power company, and the subsidy shall be carried out according to the principle of who invests who benefits, until the allocation of 800,000 yuan is completed.  

 

9. Pinghu City, Zhejiang Province  

On October 26, 2021, The Development and Reform Bureau of Pinghu City, Jiaxing city, Zhejiang Province issued a public notice on soliciting opinions on the New Round of Encouraging the Construction of Photovoltaic Power Generation Projects in Pinghu City (Draft for Soliciting Opinions), and put forward:  

(I) For industrial and commercial rooftop photovoltaic power generation projects, the implementation of three years of electricity generation subsidy, according to the actual generation of 0.1 yuan/KWH electricity price subsidy.  

(2) For schools, hospitals, party and government organs, villages (communities) and other public buildings rooftop PV power generation projects, the implementation of three years of electricity generation subsidy, according to the actual electricity generation to 0.15 yuan/KWH electricity price subsidy.  

(3) For the "agro-light complementary" PHOTOVOLTAIC power generation project, the implementation of three years of electricity generation subsidy, according to the actual generation of 0.2 yuan/KWH electricity price subsidy.  

(IV) Implement one-time installation subsidy for residential rooftop PHOTOVOLTAIC power generation projects, which is 1 yuan/watt per installed capacity.  

10. Keqiao District, Zhejiang Province  

On December 16, Shaoxing Keqiao District Development and Reform Commission "On the Whole District of Keqiao District rooftop distributed photovoltaic development Pilot Implementation Plan" in the public notice,  

 

From January 1, 2021 to December 31, 2025:  Investment in ke bridge construction conform to the requirements of the distributed photovoltaic (pv) is 3.0, and through the area hair change bureau acceptance, access to ke bridge photovoltaic digital intelligent management platform of households with pv projects, from the date of acceptance by, according to the actual capacity of the project owners according to 0.25 yuan per KWH of subsidies, subsidies cycle for 5 years, in the installation of the first year meet once a year,  We will cash it every six months thereafter.  

 

Huangpu District/Development Zone/High-tech Zone, Guangzhou City, Guangdong Province  

On May 12, 2021, the Development and Reform Bureau of Huangpu District, Development Zone and High-tech Zone of Guangzhou jointly issued measures for Promoting Green and Low-carbon Development of Guangzhou High-tech Zone of Huangpu District, Guangzhou.  

Investors in distributed photovoltaic power generation will be subsidized according to the amount of electricity generated.  

 

Application side (roof side) for non-public institutions: subsidy standard 0.15 yuan/KWH,  

 

Application side (roof side) for public institutions: subsidy standard is 0.3 yuan/KWH.  

 

Starting from 2020, the maximum subsidy period for a single project will be six years.  The subsidy period is 2020-2025.  

 

The application party (rooftop party) of distributed photovoltaic power generation project constructed by contract energy management mode will be given a one-time reward according to the installed capacity of the project, and the reward standard is 0.2 yuan/watt.  The maximum award for a single project is 2 million yuan.  

 

12. Dongguan city, Guangdong Province (municipal subsidies)  

The project belongs to the integration of solar photovoltaic construction projects or distributed photovoltaic projects and the installed capacity is not less than 20KWp, and the subsidy amount is 2 YUAN /Wp;  

The project belongs to the integration of solar photovoltaic construction projects or distributed photovoltaic projects and the installed capacity is not less than 20KWp, and the subsidy amount is 2 YUAN /Wp;  

From the end of 2017 to 2018, the installed capacity of distributed photovoltaic power generation projects that have been filed by the Municipal Development and Reform Bureau and accepted by the municipal power supply department for grid connection is within 120MW.  The entitlement period is extended to 31 December 2024  

The measures are clear, and the subsidies for special funds are post-subsidy, with the following subsidy standards:  

For the owners of all types of buildings and structures that construct distributed photovoltaic power generation projects, the installation subsidy shall be based on the installed capacity of 180,000 yuan/mw, and the maximum subsidy for a single project shall not exceed 1.44 million yuan, and the subsidy shall be allocated in four fiscal years on average.  

For all kinds of investors in distributed photovoltaic power generation projects of non-self-owned residential construction enterprises, such as government offices, public institutions, factories, traffic stations, businesses, schools, hospitals, communities and agricultural greenhouses, the subsidy will be 0.1 yuan/KWH based on the actual generating capacity. The subsidy will be continued for 5 consecutive years starting from the next month after the subsidy application is approved.  

For natural person investors who use self-owned houses or build residential distributed photovoltaic power generation projects in self-owned residential areas, the subsidy will be 0.3 yuan/KWH based on the actual generating capacity, and the subsidy will be continued for 5 consecutive years starting from the next month after the subsidy application is approved.  

13. Nanjing city, Jiangsu Province (municipal subsidies)  

On March 16, 2021, Nanjing Urban and Rural Construction Commission and Nanjing Finance Bureau jointly issued the Notice on printing and distributing nanjing Green Building Demonstration Project Management Measures, and issued relevant policies to further promote the high-quality development of green building in Nanjing.  

Green building demonstration projects will be given a one-time financial subsidy, at the same time not more than 50% of the contract price.  Individual green building demonstration projects will be subsidized according to the floor area. The subsidy standard for two-star demonstration projects is 20 yuan/m2 and the maximum subsidy is no more than 300,000 yuan.  The subsidy standard for three-star demonstration projects is 30 yuan/m2, and the maximum is 500,000 yuan;  The project of integrated demonstration of green building area and green town shall be evaluated and decided by experts according to the scale and technical application level, and the subsidy amount shall not exceed RMB 3 million.  

New shallow ground energy (ground source heat pump, water source heat pump, renewable energy regional energy station) demonstration projects shall be subsidized according to the demonstration area no more than 50 yuan/m2;  Solar photovoltaic projects shall be subsidized not more than 500 yuan/kW.  In principle, the maximum subsidy for a single renewable energy building application demonstration project shall not exceed 2 million yuan.  Year for subsidies.  

14. Suzhou Industrial Park, Jiangsu Province (District-level subsidy)  

In Suzhou Industrial Park, for projects that have been put on record and put into operation and are connected to the park's low-carbon energy public service platform, the subsidy will be provided for 3 years:  

Distributed pv will be subsidized 0.1 yuan/KWH according to the power generation after it is put into operation.  

The energy storage project will be subsidized 0.3 yuan/KWH according to the power generation (discharged power) after it is put into operation.  

The subsidy is valid until December 31, 2021.  

 

Wujiang District, Suzhou, Jiangsu Province  

On November 19, 2021, the People's Government of Wujiang District of Suzhou issued the Notice on Printing and Distributing the Implementation Plan of Distributed Photovoltaic Large-scale Development in Wujiang District.  The notice puts forward: Strive to the end of 2023, the region's new photovoltaic installed capacity of about 500 megawatts, by the end of 2025, the new photovoltaic installed capacity of about 500 megawatts.  

 

 

Implement fiscal subsidies.  Certain financial funds will be arranged every year to subsidize photovoltaic and energy storage projects connected to the grid and connected to the regional photovoltaic power generation digital management platform from July 2021 to the end of 2023:  

 

The application side of distributed photovoltaic project of industrial enterprises (roof side) will be subsidized 0.1 yuan/KWH, and the electricity generation of the project will be subsidized for one year.  

Residential rooftop pv project according to 1 yuan/watt investors one-time installation subsidy;  

Schools, hospitals, party and government organs and villages (communities) and other public buildings rooftop pv and other projects subsidized investors 0.2 yuan/KWH, subsidized 2 years of electricity generation;  

For energy storage projects actually put into operation, operators will be given a subsidy of 0.9 yuan/KWH based on the actual discharged electricity, and the subsidy will be given for 2 years of discharged electricity.  

16. Xi 'an, Shaanxi Province:  

On December 25, 2020, Xi 'an Industry and Information Technology Bureau issued the Notice on Soliciting comments on The Revision of Opinions on Further Promoting the Sustainable and Healthy Development of Photovoltaic Industry (Draft), proposing:  

1) A one-time reward of 500,000 yuan will be given to enterprises newly entered into the "Specification Conditions for Photovoltaic Manufacturing Industry" announcement of the Ministry of Industry and Information Technology.  

2) For distributed photovoltaic projects built and connected to the grid between January 1, 2021 and December 31, 2023 and in line with national and industrial standards, investors will be given a subsidy of 0.1 yuan/KWH starting from the next month of grid connection for 5 consecutive years  

3) For photovoltaic energy storage systems built and operated from January 1, 2021 to December 31, 2023, investors will be given a subsidy of 1 YUAN/KWH based on the actual charging amount of the energy storage system from the month after the project is put into operation, and the maximum annual subsidy for the same project will not exceed 500,000 yuan.  

 



全國服務(wù)熱線

13215150267
  • 地址:東莞市松山湖中小企業(yè)園十一棟
  • 電話:13215150267
  • 郵箱:liusq@singfosolar.cn
  • 手機(jī)二維碼
東莞市星火太陽能科技股份有限公司版權(quán)所有 / 備案號:粵ICP備14057282號-5 /  網(wǎng)站地圖 / 百度統(tǒng)計(jì)  技術(shù)支持: 牛商股份
多伦县| 贵溪市| 台江县| 成都市| 城市| 体育| 元氏县| 台中县| 彭水| 河间市| 准格尔旗| 旬邑县| 罗定市| 玉林市| 重庆市| 丹寨县| 盈江县| 大悟县|